The main challenge of the project was implementing the assembly rules for the distribution panels. In collaboration with ABB, we documented safety rules and preferred placements of components. These rules included the positioning of components, maximum load, phase distribution, and heat development. Due to the interdependence of these rules, the project became quite complex and challenging.
Given the complexity, it was crucial to develop the rules within a well-thought-out architecture, making them relatively simple and quick to adjust without unexpected consequences for other parts of the system. Working out and adjusting these rules continued throughout the project alongside the realization of other application components. To discuss the rules accurately and work them out properly, it was necessary for us to become domain experts.